Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/07/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS PIPING TO HAVE 10 PSI MINIMUN AT TIME OF INSPECTION. 2) VENT FROM FURNACE TO BE DOUBLE WALL THRU CEILING & ATTIC SPACE. WITH APPROVED ROOF JACK. 3) VENT FROM WATER HEATER TO BE DOUBLE WALL THRU CEILING & ATTIC SPACE WITH APPROVED ROOF JACK. |
|
| 03/04/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOT READY | |
| 03/02/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL UNDERGROUND GAS PIPING TO BE SCOTCH COATED WITH MINIMUM 12" BURIAL DEPTH. 2) ALL TOOL MARKS & FITTINGS TO BE PRIMED & TAPED 3) VENT FROM WATER HEATER WHEN WITHIN 10' OF COOLER INTAKE TO BE 3'ABOVE TOP OF COOLER INTAKE WITH APPROVED VENT MATERIALS, WITH 3- GALVINIZED SCREWS PER CONNECTION AND APPROVED CAP. 4) PROVIDE CITY APPROVED GAS ISOMETRIC OR REMOVE ANY UNUSED TEE FITTING IN SYSTEM. 5) PROVIDE # 4 OR 6 BONDING WIRE 6) VENT FROM FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 2' ABOVE COOLER INTAKE WITH APPROVED MATERIALS & VENT CAP. 7) PROVIDE UPPER & LOWER COMBUSTION AIR FOR FURNACE. |