Permit: T05PL00262

Parcel: 116160930


Addresses:

518 W DAVIS ST

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
03/01/2005 PLUMBING - GAS PRESSURE TEST Approved
02/22/2005 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :* 15 PSI AIR TEST FROM METER TO WALL FURNACE, STOVE, AND WATER HEATER OK. 1) PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM. 2) VENT FROM WATER HEATER TO BE FLASHED PROPERLY AT ROOF OF BUILDING AND WEATHER PROOF ENCLOSURE. 3) VENT FROM WALL HEATER TO BE DOULBLE WALL WHEN WITHIN 1" FROM COMBUSTABLE AT ROOF LINE AND BE SECURED PROPERLY. 4) PIPING AT STOVE & WATER HEATER TO BE SECURED PROPERLY. 5) AGA OR CSA APPROVED GAS VALVES & FLEXES TO BE ON SITE FOR ALL APPLIANCES.