Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/10/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE ROOF FLASHING FOR ALL PENETRATIONS THEN ROOF. 2) SHALL PROVIDE APPROVED FLU CAP FOR DBL WALL B-VENT @ WATER HTR 3) RE-TEST THE SYSTEM. |
|
| 02/07/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL USE REQUIRED TEST GAGE FOR SYSTEMS OF 10 LBS OR LESS OF AIR TEST. GAGE SHALL BE OF 1/10 INCREMENTS. 2) SHALL REMOVE AND REPLACE STRAPS WITH APPROVED 2 HOLE STRAPS FOR GAS LINE ON ROOF. 3) SHALL PROVIDE AGA OR CSA GAS SHUT OFF VALVE FOR RANGE. 4) SHALL PROVIDE FLU VENT CAP FOR WATER HTR. 5) SHALL REMOVE UNION INLINE AND REPLACE WITH RIGHT & LEFT HAND NIPPLE. 6) SHALL EXTEND T & P DRAIN TO DAYLIGHT AND REMOVE FLEX LINE. 7) SHALL CALCULATE BTU TO CFH DEMAND TO DETERMIN GAS LINE SIZE. IT APPEARS THAT 1" MIN TO GAS PACK REQUIRED. 8) RE TEST THE SYSTEM. |