Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05PL00146
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/16/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
02/11/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED CORRECT PRESSURE RELIEF DEVICE INSTALLED YOU HAVE INSTALLED A PRESSURE REGULATING VALVE. |
|
02/07/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PETITION OF APPEAL # 2005.152 ONSITE. 1) INSTALL THE 125 # PRESSURE RELIEF VALVE AT EXTERIOR H20 SUPPLY PIPING. 2) PROVIDE PERMIT FOR NEW WALL HEATER OR HAVE ADDED TO THIS PERMIT. 3) VENT FROM WALL HEATER TO BE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE. 4) SECURE PIPING TO NEW WALL HEATER. 13 PSI AIR TEST FROM METER TO NEW BUILDING SERVICE VALVE TO WATER HEATER STOVE AND WALL HEATER OK | |
02/02/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE RIDGID PIPING THRU WALL WITH AGA OR CSA APPROVED SHUT OFF VALVE OUTSIDE OF HEARTH WITHIN 4' OF HEARTH WITH 10 PSI MINIMUN TEST. 2) PROVIDE VENT FOR FIREPLACE AND LISTING FOR ARTIFICIAL LOG INSIDE FIREPLACE. 3) PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM. 4) WATER HEATER TEMPERATURE & PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH APPROVED INSTALLATION OF WATER HEATER TEMPERATURES & PRESSURE PIPING & VALVES |