Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 15 PSI AIR TEST FROM METER EXISTING 1 1/2 TO POOL HEATER. NEW 1" SCOTCH COAT UNDER GROUND, RISE UP ALONG WALL BACK UNDERGROUND UP AT BUILDING ACROSS ROOF TO WATER HEATER, FIREPLACE, ROOF TOP UNIT OK | |
| 01/14/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)PROVIDE BONDING OF BUILDING GAS PIPING #4 WIRE. 2)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & C0UPLINGS SHALL BE USED. 3)AGA OR CSA APPROVED GAS VALVES TO BE USES AT ALL LOCATIONS. 4)PROVIDE ROOF FLASHINGS AT PIPE PENETRATIONS THRU ROOF. 5)EXPOSE UNDERGROUND PIPING FOR VIEWING OF PIPE PRIME & TAPE AT JOINTS & TOOL MARKS 6)WATER HEATER TEMPERATURE & PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT. |