Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*ALL CORRECTIONS HAVE BEEN MADE | |
| 02/01/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO CORRECTIONS HAVE BEEN MADE |
|
| 01/31/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection :1) SHALL REMOVE UNION IN LINE @ WATER HEATER ROOM AND REPLACE WITH A RIGHT & LEFT HAND NIPPLE. 2) SHALL CAP OR PLUG GAS SUPPLY TO DRYER IF NO APPLIANCE IS AVAILABLE. 3) SHALL EXTEND WATER HTR T & P DRAIN TO DAYLIGHT & TERMINATE 6" ABOVE GROUND. 4) SHALL EXTEND FURNACE FLU VENT 2'-0" ABOVE COOLER. 5) SHALL EXTEND WATER HTR FLU VENT MIN 1' _0" ABOVE ROOF. 6) RE TEST THE SYSTEM |