Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/19/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* 10 PSI AIR TEST ON REPAIRED PIPING AT BUILDING FROM METER TO POOL HEATER, WATER HEATER, AND FURNACE ONLY OK CORRECTION MADE. GAS CARD LEFT AT METER. 889-1888 |
| 01/14/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED. 2)PRIME & 10 MIL TAPE ALL UNDERGROUND FITTINGS & TOOL MARKS. 3)PIPING AT POOL HEATER TO BE MINIMUM 6" ABOVE FINISH GRADE AND UNDERGROUND PIPING TO BE SCOTCH COATED PRIMED & TAPED WITH 3' MAXIMUM FLEX LENGTH 4)10 PSI AIR TEST MINIMUM AT TIME OF INSPECTION WITH NO PRESSURE DROP FOR 15 MINUTES. |