Permit: T05OT02982


Addresses:

15 W GRANT RD


Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T05OT02982

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/28/2006 ELECTRIC - FINAL Approved IVRS - Inspection :*
03/23/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
PERMIT REQUIRED FOR WIRES REPULLED ON 400 AMP SW AT MAIN GEAR TO CARWASH SERVICE AND HAVE INSPECTED PRIOR TO OK ON THIS PERMIT.
ELECTRICAL CONTRACTOR REQUIRED TO PULL PERMIT.
03/22/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. AS PER LAST INSPECTION CAR WASH BLDG WAS NOT TO BE ENERGIZED FEEDERS FROM SWITCHGEAR TO CAR WAS
BLDG. HAD BEEN REMOVED, THESE HAVE TO BE INSPECTED AT BOTH ENDS - SET UP MEETING WITH CONTRACTOR DOING WORK TO INSPECT.
2. ALL LIGHT POLES INSPECTED & SOME HAND HOLE COVERS MISSING.
3. SOME J-BOXES OUTSIDE HAVE HAD COVERS REMOVED.
4. PROPERLY DEAD END UNUSED CIRCUITRY AT OUTSIDE SIGNS.
5. CLOSE UP ALL ELECTRICAL PANELS & EQUIPMENT IN ELECTRICAL ROOM.
01/24/2006 ELECTRIC - FINAL Not ready for Inspection WORK IN PROGRESS -- NEW PERMIT NEEDED?
01/10/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1) OK FOR TEP TO RECONNECT SERVICE FOR THE PURPOSE OF ON GOING CONSTRUCTION POWER ONLY
2) DO NOT ENERGIZE CAR-WASH AREA OR PUMP AREA
3) A NEW PERMIT AND APPROVED PLANS NEED TO BE PROVIDED FOR ADDITIONAL WORK
4) THIS BLDG NOT SAFE TO OCCUPY UNTIL REMAINDER OF WORK IS FINISHED
5) NEED TO FOLLOW UP EVERY TEN DAYS PLEASE
12/13/2005 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CALL WHEN READY BILL 820-0789