Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05OT01903

Parcel: 134113750

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T05OT01903

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
05/19/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
PROVIDE 1" AIR GAP AT 3-COMP SINK
(2) IN HOUSE BACKFLOW CERTIFICATIONS.
05/15/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. PROVIDE CERTIFICATION FOR ICE MACHINE & CARBONATOR BACKFLOW DEVICES.
2. SUPPORT 3-COMP SINK FLOOR SINK.
3. NOTE YOUR EXISTING GAS LINE HAS AN IMPROPER REPAIR COUPLING ON WALL (WEST) GAS LINE. THIS SHOULD BE CORRECTED PROPERLY FOR YOUR WELL BEING.
02/08/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
ITEM #3 REQUIRES REDUCED PRESSURE PRINCIPLE BACKFLOW DEVICE WITH DRAIN CONNECTED TO FLOOR SINK WITH 1" AIR CAP 007 DEVICE HAS BEEN ADDED AT THIS LOCATION WHICH WOULD BE CORRECT PROTECTION FOR ICE MACHINE.
ITEM#4 NEED ADDED FLOOR SINK TO BE SUPPORTED AND CORRECTLY INSTALLED.
ITEM#6 REQUIRES CORRECT TERMINATION OF DRAIN AT APPROVED RECEPTOR.
ITEM#7 IS WHAT IS STATED YOUR 007 DEVICE WOULD BE CORRECT PROTECTION IF 1" AIR GAP FOR WATER SUPPLY CANNOT BE PROVEN.
08/10/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE 1" AIR GAP FOR ALL INDIRECT DRAINS INTO FLOOR SINKS
2) PROVIDE 3-GALVANIZED SCREW AT EACH JOINT OF WATER HEATER VENT PIPING
3) PROVIDE BACKFLOW PROTECTION FOR SODA CARBONATOR
4) PROVIDE CORRECT DRAINAGE FOR DISHWASHER DISCHARGE DRAIN
5) EXTEND WATER HEATER VENT 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE
6) PROVIDE SEPERATE DRAINS FULL SIZE FOR ICE MACHINE BIN AND MAILER SECTION
7) PROVIDE PROOF OF 1" AIR GAP OR PROVIDE BACKFLOW PROTECTION FOR ICE MACHINE