Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) ALL CORRECTIONS HAVE BEEN MADE 2) PLUMBING FINAL IS OK 3) OK FOR C OF O |
|
| 07/14/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE VACCUM BREAKER AT ALL EXTERIOR HOSE BIBS AND AT SERVICE SINK 2) SHALL PROVIDE OPEN FRONT SEATS FOR BOTH WATER CLOSETS 3) SHALL REMOVE FLEX LINE AT T & P DRAIN FOR WATER HTR AND LOWER THE EXISTING T & P DRAIN FOR GRAVITY FLOW 4) SHALL PROVIDE A DRIP PAN; DRAIN FOR WATER HTR AND PROVIDE A EXPANSION TANK |