Permit: T05ME00956

Parcel: 135021220

Inspection Status: Partial Approval

Inspection History: MECHANICAL - FINAL

Date Description Inspector Results Comments
01/06/2006 MECHANICAL - FINAL Partial Approval IVRS - Inspection :*
1) WATER HEATER VENT INSTALLED UPSIDE DOWN
2) DO NOT CUT DBL WALL PIPE
3) WILL LEAVE GAS CARD ON FINAL
01/06/2006 MECHANICAL - FINAL Approved IVRS - Inspection :*
1) CORRECTIONS HAVE BEEN MADE
2) LEFT GAS CARD
12/28/2005 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*FURNACE VENT MUST INCREASE TO 4" AT OUTLET ON FURNACE. CONNECT OVERFLOW SENSOR ON CONDENSATE PUMP
CONDENSATE LINE ON ROOF VENT MUST BE DOWNSTREAM OF THE TRAP.
REMOVE SCREWS FROM DRYER VENT & EXTEND BEYOND WALL. EXPOSE DRYER VENT FOR INSPECTION.
EXTEND WATER HEATER VENT 2' ABOVE UPPER ROOF
BOND THE GAS LINE TO THE ELC. SERVICE
15 PSI TEST IS OK
CAP OFF GAS VALVE @ DRYER
WILL LEAVE GAS CARD ON FINAL INSPECTION