Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2005 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/06/2005 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 3-GALV SCREWS AT EVERY JOINT OF FURNACE VENT PIPING. SINGLE WALL REQUIRES 6" MINIMUM CLEARANCE FROM COMBUSTIBLES 2) REMOVE KINK FROM CONDENSATE PUMP PIPING 3) FURNACE VENT PIPING TO TERMINATE 2' ABOVE TOP OF COOLER INTAKE WITHIN 10' OF INTAKE AND BE SECURED PROPERLY 4) PROVIDE CORRECT OVER CURRENT PROTECTION FOR APPLIANCES |