Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05ME00359

Parcel: 135030620

Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Date Description Inspector Results Comments
10/07/2005 MECHANICAL - FINAL Approved IVRS - Inspection :*CONTRACTOR TO USE LOFT RIGHT NIPPLES COUPLING TO MAKE CLOSURE ON GAS PIPING AND SOAP TEST TO VERIFY NO LEAKAGE.
07/08/2005 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999* PROVIDE A MIN. 10 LB PRESSURE TEST ON NEW GAS PIPING. SEAL THE SMALL HOLE WHERE ELECT CONDUIT WAS GOING TO PENETRATE THE ROOF UNDER THE EVE. DO NOT USE A CHASE NIPPLE TO CONNECT THE SLB TO THE CIRCUIT PANEL. USE AND APPROVED FITTING. ELECT WIRES INSIDE CIRCUIT PANEL CANNOT PASS IN FRONT OF THE CIRCUIT BREAKERS OR AREAS FOR FUTURE BREAKERS. RECALL FOR INSPECTION.