Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2005 | MECHANICAL - FINAL | Approved | IVRS - Inspection :*ALL CORRECTIONS HAVE BEEN MADE. | |
| 05/04/2005 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HOOK UP OVERFLOW SENSOR ON CONDENSATE PUMP. PROVIDE A HOSE CLAMP WHERE PLASTIC HOSE CONNECTS TO 3/8 COPPER. GAS IS LEAKING FROM LOOSE GAS CONNECTOR. VENT CONNECTOR MUST BE INCREASED TO 4" AT THE FURNACE OUTLET AS PER INSTALL INSTRUCTIONS. 2) PROVIDE CLEARANCE WHERE PVC PASSES IN FRONT OF VENT CONNECTOR. USE COPPER IF NECESSARY 3) PROVIDE PROTECTION WHERE REFER LINES ARE SCRAPING ON COIL KNOCKOUTS 4) CIRCUIT BREAKER 50 AMP TO LARGE. 45 AMP IS MAX. 5) ISOLATE COPPER LINES FROM STEEL STRAPS 6) EXTEND FURNACE VENT 2' ABOVE EVAP COOLER |