Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05ME00004

Parcel: 131113270


Addresses:

5819 E 35TH ST


Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Permit Number - T05ME00004

Inspection Description - MECHANICAL - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/13/2005 MECHANICAL - FINAL Approved IVRS - Inspection :*
01/12/2005 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999* PRESS GAUGE ON ROOF AT NEW UNIT. IS INDICATING 04 PSI MUST MAINTAIN 10 PSI MINIMUM FOR 2HRS. LOCATE CORRECT RECALL
01/12/2005 MECHANICAL - FINAL Not ready for Inspection IVRS - Inspection :*NOT READY
01/11/2005 MECHANICAL - FINAL Cancelled IVRS - Ri canceled
01/07/2005 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) EXTEND THE CONDENSATE DRAIN LINE SO THAT IT DRIPS INTO THE RAIN GUTTER, NOT ONTO THE ROOF
2) PROVIDE A MINIMUM 10 POUND PRESSURE TEST ON ALL NEW GAS PIPE AND FITTINGS. YOU CAN PUT A SHUT OFF VALVE AT THE END OF EXISTING PIPE IN ATTIC BEFORE THE ELBOW AND TEES. SHUT OFF VALVE AT STOVE AND PUT THE PRESSURE GAUGE ON THE ROOF
3) RECALL FOR INSPECTION
4) REMOVE THE SHUT OFF VALVE FROM OLD WALL HEATER LOCATION AND CAP OFF PIPE