Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - FIRE PROTECTION SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2005 | VIOL - FIRE PROTECTION SYSTEMS | Approved | REPAIRS MADE | |
| 04/08/2005 | VIOL - FIRE PROTECTION SYSTEMS | Partial Approval | MAIN VALVE REPLACED AND 4" PIPE BELOW REPLACED. SPRINKLER HEAD REPLACED IN COOLER |
|
| 03/16/2005 | VIOL - FIRE PROTECTION SYSTEMS | Violation | PER SPRINKLER INSPECTION REPORT THE FOLLOWING PROBLEMS SHALL BE TAKEN CARE OF: 1. MAIN VALE DOES NOT SHUT, NEED TO REPAIR OR REPLACE 2. REPLACE DAMAGE SPRINKLER HEAD IN BAKERY COOLER. 3. 4" PIPING BELOW MAIN SHUT OFF IS LEAKING SHALL HAVE PIPING REPLACED. 4. REPLACE MISSING CECILING TILE IN KITCHEN AREA |