Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - FIRE PROTECTION SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2005 | VIOL - FIRE PROTECTION SYSTEMS | Approved | Sprinkler was repaired. no problems | |
| 06/07/2005 | VIOL - FIRE PROTECTION SYSTEMS | Violation | Pre-Citation given for non-complacence. A Mr. Eric Castell signed for pre-citation. Pre-citation in file. | |
| 05/11/2005 | VIOL - FIRE PROTECTION SYSTEMS | Violation | Talked to Mr. Robison, he told that the general manager wanted to talk to me about the building. I advised Mr. Robison that the sprinkler coverage under the bay door is needed and will get done. | |
| 04/22/2005 | VIOL - FIRE PROTECTION SYSTEMS | Violation | Talked to Mr. William Robison (operations manager), he stated that they removed the office completely. I asked about the overhead door coverage done he stated no, and then asked why was this not taking care of at time when the building was built. I pulled the sprinkler plans for the building and advised Mr. Robison that were where no overhead doors on the plans when building was first built (1996). Mr. Robison stated he would get with his boss and see if they are going to do it, I advised him they are going to do it and time is running short. Mr. Robison took my name and cell phone and will be getting back to me 4/25/2005. | |
| 02/02/2005 | VIOL - FIRE PROTECTION SYSTEMS | Violation | TFC 901.6 Fire Protection systems. Fire sprinkler systems shall be maintain at all times. The following problems have been found and need corrections: 1.) Maintain sprinkler coverage in storage office. False ceiling is blocking sprinkler coverage. Remove room or add sprinkler coverage. 2.) Add sprinkler coverage under garage door in work area. 3.) Clear brushes from front of the FDC You will need a Lic. sprinkler contractor to correct problems. You will need approved plans and permits before any work is done. |