Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T05FR00082

Parcel: 134270010


Addresses:

7600 E BROADWAY BL


Inspection Status: Approved

Inspection History: VIOL - FIRE PROTECTION SYSTEMS

Case Number - T05FR00082

Inspection Description - VIOL - FIRE PROTECTION SYSTEMS

Inspection Status - Approved

Date Description Inspector Results Comments
03/23/2005 VIOL - FIRE PROTECTION SYSTEMS Approved Appeal approved by the Chief not requiring the relocation of the sprinkler head.
02/02/2005 VIOL - FIRE PROTECTION SYSTEMS Violation Reinspection, ceiling has been pulled up, sprinkler heads are in the open.
Still waiting for appeal from Chief on sprinkler heads to close to each other.
01/25/2005 VIOL - FIRE PROTECTION SYSTEMS Violation Appeal to the Chief. Asking not to move the sprinkler head in the kitchen.
01/19/2005 VIOL - FIRE PROTECTION SYSTEMS Violation Reinspection done nothing done again "PRE-CITATION GIVEN". Dead line is 1/26/2005. Michel Genduso signed pre-citation notice.
12/07/2004 VIOL - FIRE PROTECTION SYSTEMS Violation Reinspection nothing done, new maintance person he knew nothing about it. Gave a copy of feild notice from 11/16/2004 and copy of sprinkler report to him and showed problem area.
11/16/2004 VIOL - FIRE PROTECTION SYSTEMS Violation Tfc 901.6 Fire protection systems. Fire sprinkler systems shall be properly maintain at all times.
Per sprinkler report received from Roadrunner on 11/10/04 states problems with sprinkler system.
1.) Multiple heads in kitchen area needs to be lowered. Ceciling is falling down need to move heads down or pull ceciling back up.
2.) Two sprinkler heads are to close to each other. By entrance way into kitchen heads shall be 6' apart from each other (right now 4' 11" apart).
Feild notice given to Mike Genduson.