Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE GROUNDING, WATER, GAS BONDING 2) GROUNDING ELECTRODE SYSTEM NOT INSTALLED AT UNIT #2 (250-32 NEC) 3) LOAD CONDUCTORS NOT INSTALLED |