Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/13/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspectio SEPERATE NEUTRALS AND GROUNDS IN SUB PANELS PROVID ACCESS TO WATER AND GAS BOND PAY REINSPECTION FEE SMALL SUB PANEL WILL NEED EQUIPMENT GROUND |
|
| 02/07/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210*NEED 3/0 FOR 200 AMP SUB PANEL SEPERATE GROUNDS AND NEUTRALS IN BOTH SUB PANELS CORRECTLY IDENTIFY AL BRANCH CKT'S BOND METAL PIPE SYSTEMS TO SERVICE-WATER, GAS, AND DRAIN SEAL HOLE IN ROOF & PROVIDE LADDER FOR FLASHING INSPECTION CHECK WIRING METHOD-NEC 518.4 AND PROVIDE JOB PLANS |
|
| 01/11/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210* 1) INSTALL FLASHING CORRECTLY AND SEAL ROOF PENETRATIONS (GUY) 2) CORRECTLY IDENTIFY PANEL DIRECTORY 3) INSTALL ADDRESS LABEL FOR SERVICE 4) TIGHTEN ALL GROUNDING BUSHINGS AND SET SCREWS 5) CLOSE ALL UNUSED OPENINGS IN EQUIPMENT 6) EXISTING PANEL IS NOW A SUB-PANEL AND NEEDS 3/0 CU PHASE CONDUCTORS WITH AN EQUIPMENT GROUND-SEPERATE THE GROUNDS AND NEUTRALS AND INSTALL DEAD FRONT COVER 7) BOND ALL METAL PIPE SYSTEMS TO SERVICE 8) ADD ANY NEW BRANCH CKTS TO PERMIT FOR INSPECTION 9) L.B. BY DOOR NOT CONNECTED AND IS OPEN |