Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2006 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 01/10/2006 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* NOTES: DO NOT USE GROUNDED RECEPTS ON UNGROUNDED CIRCUITS, LIGHT SWITCHES MUST BE GROUNDED WHERE APPLICABLE |
|
| 12/29/2005 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OWNER OBTAINED SERVICES OF OCEANSIDE ELECTRICAL CONTRACTORS - OK SERVICE GROUNDING & BONDING, HOWEVER OWNER TO OBTAIN PERMIT & PLANS FOR INSIDE, NEW WIRING. OPEN BOXES AND CEILINGS AS NECESSARY TO INSPECT WIRING METHODS. 2. C-11 LICENSED CONTRACTOR TO PROVIDE LETTER OF VERIFICATION THAT ELECTRICAL SYSTEM HAS BEEN CHECKED OUT, SAFE AND OPERABLE. |
|
| 12/02/2005 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/18/2005 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 11/07/2005 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*2 GROUND RODS REQUIRED 6' MIN APART. BOND WATER PIPING USE PROPER FITTING AT 1 1/2" TERMINATION INTO PANEL |
|
| 10/10/2005 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |