Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2005 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 10/05/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/27/2005 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* #1 NOT COMPLETE ALL THE WAY #1 #2 OK UP TO 6 THROWS #3 OK NOT REQUIRED #4 OK 5 OK |
|
| 09/23/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* NO ANSWER AT DOOR. COULD NOT OPEN GATE FROM OUTSIDE. RECALL INSPECTION. |
|
| 08/19/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) AN APPROVED WIRING METHOD AT BACK OF PANEL-METHOD NOT A SLEEVE. TERMINATE METHOD-ALSO FOAM IS COMBUSTIBLE LABELING TO BE PERMANENT 3) PLEASE COMPLETE ITEMS 1, 2, 4, 5 AND 6 OF PREVIOUS INSPECTION |
|
| 08/15/2005 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CONDUIT TO BE AT 18" PER 300.5 2) A MAIN IS NEEDED AT 2ND STRUCTURE 225.30 AND 225.31 3) BOND NEUTRAL AND GROUND AT 2ND STRUCTURE 250.24 4) CONDUCTOR TO BE ENCLOSED IN A RACEWAY OR NIPPLE IN BACK OF PANEL. SINGLE CONDUCTORS NOT ALLOWED TO PASS THROUGH OPEN WALL 5) PLEASE LABEL 2ND PANEL 6) PLEASE VERIFY GAS AND WATER BONDS |