Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2005 | ELECTRIC - RECONNECT | Approved | IVRS - Inspection :* | |
| 06/28/2005 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* NOTES: 1) COOLER SWITCHES/BOXES NEED TO BE SUPPORTED TO STRUCTURE CANNOT USE FITTINGS FOR SOLE SUPPORT. |
|
| 06/27/2005 | ELECTRIC - RECONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED WEATHER PROOF LOUVERS ON OUTSIDE RECEPTACLES 2. INSIDE PANEL-SEAL TOP HOLE. 3. USE SAME TYPE BREAKERS A PANEL. 4. PROPERLY SIZE BREAKERS TO CIRCUITS. 5. COOLER SWITCHES TO BE PROPERLY MOUNTED 6. TIME CLOCK TO BE SUPPORTED. 7. COOLER SWITCHES ON 2ND PANEL EAST IMPROPERLY SUPPORTED. 8. SWITCH AT FRONT SALES AREA NEEDS EXTENSION RING & COVER. 9. REMOVE EXTENSION WIRING AT BOTTOM OF STAIRS. 10. SECURE ALL EXPOSED MC CABLE BY PANELS AND RECEPTACLES. |