Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T05EL00817
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2005 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/25/2005 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : The bonding is not per code.| 235* 1. THE GROUNDING ELCRODE(S) MUST BE LOCATED IN THE SAME AREA AS THE GROUNDING ELECTRODE CONDUCTOR CONNECTION TO THE SYTEM. SEE NEC ART 250-30(4) YOU WILL HAVE TO INSTALL TWO NEW GROUND RODS IN THE SAME AREA A THE SERVICE PANELS AND RUN A GROUNDING ELECTRODE CONDUCTOR FROM ROD TO ROD TO PANELS. THE OTHER GROUNDING CIRCUIT MAY BE LEFT IN PLACE. THANKS. RECALL INSPECTION |