Inspection History Details
Inspection Status: Compliance
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T05DV00627
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Compliance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2006 | INSP - FOLLOW UP CODE ENFORCE | Compliance | COMPLIANCE CASE CLOSED- VISITED SITE TOOK PICTURES, FRONT EAST SIDE NO GATE, NO ENTRY TO POOL AREA, REAR (ALLEY) 1 GATE OPENS OPPOSITE THE POOL SELF CLOSES SELF CATCHES, ALSO SECURES BY POD LOCK, WEST SIDE FRONT 6' WOODEN SLATTED GATE OPEN OPPOSITE THE POOL LEADS INTO AREA WHICH IS FENCED OFF WITH CHAIN LINK, HAS ONE GATE LEADING INTO POOL AREA, GATE OPENS OPPOSITE THE POOL, SELF CLOSES AND SELF LATCHES ALL CHAIN LINK HAS HAND SLATS INSTALLED TO PREVENT CLIMBING ON OPPOSITE SIDE OF POOL. PICTURES IN PACKET. | |
| 01/27/2006 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, TOOK PICTURES, ALL BLOCK WALL UP. REAR ALLEY GATE OPERATES AS INTENDED, GATE TO WESTSIDE FRONT, OWNER MARY STATED SHE IS HAVING THE GATE MADE, FOR THIS AREA. AT THIS TIME I CANNOT GAIN ENTRY INTO THE BACKYARD. MARY STATED WILL HAVE ALL CORRECTED BY THIS WEEKEND. | |
| 01/19/2006 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | 1/13/06, VISITED SITE, TOOK PICTURES, ALL OF BLOCK FENCE HAS BEEN INSTALLED, GATE IN REAR IS UP, BUT HAS NOT BEEN COMPLETED, LACKS HARDWARE, ALTHROUGH GATE HAS BEEN SECURED, FRONT WEST SIDE GATE IN SAME CONDITION. REITTERATED TO OWNERS IT IS THERE RESPONSIBILITY TO MAKE SURE POOL IS SECURED AT ALL TIME, FENCE PERSON WILL BE COMMING BACK TO FINISH GATES, HOPING THIS WEEK. F/U INSP. | |
| 12/28/2005 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | VISITED SITE, TOOK PICTURES, UPON ARRIVAL COULD SEE WHERE BLOCKS HAS BEEN PLACED ON PROPERTY, FRONT YARD, DROVE ALLEY TO SEE REAR PART OF FENCING, FOUND BUCK ANDERSON ERECTING BLOCK FENCE (AT WORK) FOOTER 12", ALSO WENT OVER ISSUE OF POOL GATE, NEEDS TO OPEN OPPOSITE POOL AND HAS TO BE SELF CLOSING AND SELF LATCHING, BUCK WILL INSTALL, TEMPORARY FENCE (PLASTIC ORANGE) HAS BEEN PLACED AROUND POOL, BUCK STATED WILL MAKE SURE IT STAYS IN PLACE UNTIL FENCE HAS BEEN ERECTED, SHOULD BE DONE BY JAN. 3 OR 4TH, FOLLOW UP SCHEDULED FOR 1/6/06 |
|
| 12/07/2005 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | 12/7/05, VISITED SITE, TOOK PICTURES, KNOCKED ON DOOR TALKED WITH BRUCE, BROTHER, WHO STATED THAT LOAN WAS APPROVED AND IS EXCEPTED TO RECIEVE MONIES ON FRIDAY 12/9/05, I ASKED IF SHE HAD ALL READY MADE CONTACT WITH CONTRTACTOR TO SEE ABOUT SCHEDULING FOR REPLACEMENT, BRUCE DID NOT KNOW, I LEFT MY CARD WITH CELL NUMBER FOR MARY (OWNER) TO MAKE CONTACT. DETERIORATED WOOD FENCE IS STILL UP AND SECURED WITH ADDED SUPPORT POST, POOL IS SECURED. | |
| 11/07/2005 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | 11/7/05, VISITED SITE, TOOK PICTURES, FOUND WOOD SLATTED FENCE HAS BASICIALLY NOTHING DONE, I CHECKED FENCE AGAIN LOSING STABILITY, BRUCE WAS AT STRUCTURE DOING WORK IN REAR YARD, HAD BRUCE RESTRENGHTEN THE FENCE THIS WAS DONE WHILE STILL ON SITE, OWNER IS IN PROCESS OF TAKING OUT A SECOND, SHOULD RECIEVE THIS WEEK, HAS ALL READY RESEARCHED A CONTRACTOR, WAITHING FOR MONEY, FENCE IS THE FIRST TO BE DONE. FENCE IS ERECT AND STABILE AT THIS TIME, GRANTED ANOTHER 30 DAY EXTENSION. |
|
| 09/08/2005 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | 9/8/05, VISITED SITE, TOOK PICTURES, FOUND ALL IMMEDIATE ISSUES HAS BEEN REPAIRED, NO UNLAWFUL ENTRIES FROM OUTSIDE POOL AREA, BARRIER FENCE STILL NEEDS WORK, SINCE ALL IMMEDIATE HAZARDS HAS BEEN ABATED GAVE 30 DAYS FOR ALL PROPER REPAIRS TO FENCE, EXPOSED WOOD, OVER GROWN VEGETATION. F/U 30 DAYS 10/10/05. |