Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T05DV00615
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2005 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE , MET WITH ASSISTANT MANGER MARC, I MENTIONED THAT DNR HAD BEEN CALLED OUT CONCERNING THE POOL LIGHT. MARC MENTIONED THAT MANGEMENT WAS AWARE OF THE PROBLEM AND THAT BERT'S PLUMBING AND ELECTRIC HAD ALREADY BEEN OUT TO REPAIR THE LIGHT AND PUT THE LIGHT ON A TIMER.LIGHT WAS PUT ON A TIMER ALL ELECTRICAL REPAIRS MADE, BUT THAT THE METAL FRAME THAT THE LIGHT SITS IN HAD BROKEN CLIPS AND WAS NOT STAYING IN THE LIGHT OPENING. MARC MENTIONED THAT BERT'S WAS ORKERIONG THE PART AND THAT APARTMENT MAINTANENCE WOULD COMPLETE THE INSTALL. WHILE ON SITE I WALKED THE PERIMETER OF THE POOL FENCING, FOUND THE FENCING TO BE INTACT, BOTH GATES SWINGING AWAY FROM THE POOL AREA WITH SELF LATCHING, SELF CLOSING HARDWARE. ONLY ONE GATE WAS USED FOR THE POOL, THE OTHER GATE USED BY MAINTANENCE ONLY. PICTURES WERE TAKEN. LEFT SITE CALLED BERT'S PLUMBING AND CONFIRMED THAT THE PART HAD BEEN ORDERED AND THAT SENECA VILLAGE WAS RESPONSIBLE FOR DOING THE INSTALL. DID CALL MARC AT SENECA VILLAGE TO CONFIRM INSTALLATION DATE, MARC FELT THAT THEY WOULD RECEIVE THE PART MON- TUES, AND THAT THE LIGHT WILL BE INSTALLED NO LATER THAN TUESDAY. WILL FOLLOW UP ON TUESDAY TO CONFIRM LIGHT WAS INSTALLED. DNR HAS NO FURTHER ISSUES, CASE CLOSED. |