Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2005 | INSP - FOLLOW UP CODE ENFORCE | Approved | PG.1 VISITED SITE ON FW/UP INSPECTION, MET WITH OWNER ALSO PRESENT WAS DNR INSPECTOR WILLIAM NAVARRO. DID EXTERIOR INSPECTION OF PROPERTY. PROPERTY HAS BEEN LANDSCAPED NEW ROCK & VEGETATION. EXTERIOR WOOD TRIM AND POUCHES HAVE BEEN PAINTED. STRUCTURAL VIOLATION WAS FOUND WITH PORCHES STRUCTURAL 1) 4x6 POST LACKING BASE SUPPORT HARDWARE. OWNER WAS INSTRUCTED TO INSTALL POST BASE HARDWARE AND 30 DAYS WERE GIVEN TO ABATE VIOALTION NOV ISSUED FOR THIS VIOLATION. OWNER HAS MADE GOOD PROGRESS ON ABATEMENT OF ISSUES. INSPECTION RESULTS ARE AS FOLLOWS: 1) TC 16-11 (A) FIRE SAFETY-(4643 ADDRESS) ABATED 11-4-05 NEW 100 AMP SERVICE HAS BEEN INSTALLED AND (4641) PERMIT # T05EL 3) TC 16-11-C ELECTRICAL SYS (1+2) PERMITS REQUIRED 15-4(4643) 1)ABATED 11-04-05 NEW 100 AMP SERVICE HAS BEEN INSTALLED + PERMIT #T05EL PG. 2 2)ELECTRICAL HAS BEEN RE-ENERGIZED, TEST EQUIPMENT USED ON RECEPTACLES FOUND 3 PRONG RECEPTACLES HAVE BEEN INSTALLED INTO 2 WIRE SYSTEM. 3 PRONG RECEPTACLES TESTED FOR OPEN GROUNDS. OWNER WAS GIVEN THE OPTION TO REPLACE ALL 3 PRONG RECEPTACLES, OR HAVE ELECTRICAL CONTRACTOR INSTALL 6 FCI PROTECTION ON 1ST RECEPTACLE TO PROTECT RECEPTACLES DOWNSTREAM, OR HAVE CONTRACTOR INSTALL GROUND UNDER PERMIT. 3)ABATED 11-4-05. ALL MISSING AND BROKEN RECEPTACLE COVER PLATES HAVE BEEN INSTALLED 4)ABATED 11-4-05 OWNER HAS INSTALLED NEW RECEPTACLE. 5)NOT ABATED 11-4-05 TEST EQUIPMENT FOUND OPEN GROUND & GFCI WOULD NOT TRIP WHEN TESTED. APPROVED INSTALLATION OF 2 PRONG RECEPTACLE IN KITCHEN, NO ALTERATION TO RECEPTACLE WILL NOT BE ADDRESSED. 6)NOT ABATED 11-4-05 REPAIRS IN PROCESS. PG 3 4)TC 16-11 D MECHANICAL SYSTEM 16-4 PERMITS REQUIRED(4643) NOT ABATED 11-4-05 OWNER WORKING ON PERMIT 5)TC 16-11-E PLUMBING 2,3,4 + 5 NOT ABATED- 11-4-05 INSPECTION OF STRUCTURE PLUMBING SYSTEM FOUND BATHROOM LAVE SINK LEAKING FROM STEMS. ALL OTHER PLUMBING THROUGH OUT STRUCTURE WAS FOUND IN GOOD WORKING CONDITION 6) TC 16-12 BUILDING AND STRUCTURE EXTERIORS ALL EXTERIOR SURFACES ABATED 11-4-05 NEW EXTERIOR DOOR WITH THRESH HOLD AND WEATHER STRIPPING HAS BEEN INSTALLED. 8)TC 16-12 BUILDING AND STRUCTURE EXTERIOR D COOLERS NOT ABATED 11-04-05 COOLER STAND HAS NOT BEEN ADDRESSD. OWNER IN PROCESS OF HAVING NEW COOLER STAND BUILT. OWNER HAS MADE GOOD PROGRESS, REQUESTED EXTENSION . 30 DAYS WERE GIVEN TO ABATE REMAINGING VIOLATIONS. PICTURES WERE TAKEN |