Case: T05DV00564

Parcel: 10510054A


Addresses:

275 E NORMA LN

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
01/31/2006 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, MET WITH OWNER VIRGINIA MCCABE. I WALKED THE UNIT WENT ITEM BY ITEM ON THE NOV, FOUND THAT ALL ITEMS HAD BEEN ABATED. OWNER TOTALLY RENOVATED THE STRUCTURE, NEW TILE IN SOME AREAS, NEW COUNTER TOPS IN KITCHEN. NEW APPLIANCES WERE INSTALLED. NEW HEAT PUMP ON THE ROOF. PAINT INSIDE AND OUT. OWNER WENT ABOVE AND BEYOND WHAT NEEDED TO BE DONE INCLUDING THE ITEMS ON NOV. PICTURES WERE TAKEN. COMPLIANCE. CASE CLOSED.
11/08/2005 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, MET WITH CONTRACTOR BART WHO MENTIONED THAT HE WAS DOING A GOOD PORTION OF THE WORK INSIDE THE STRUCTURE, SUCH AS THE PAINTING INSIDE AND OUT, ALL DRYWALL REPAIRS, ALL THE TILE WORK, AND REPLACING SOME OF THE VANITIES AND MOST OF THE COUNTER TOPS. BART ALSO MENTIONED THAT HIS PORTION OF THE WORK WILL NOT BE COMPLETED FOR AT LEAST 3 WEEKS. HE ALSO MENTIONED THAT THE OWNER VIRGINIA MCCABE HAD ALL BASEBOARD HEATERS REMOVED AND WAS HAVING A NEW HEAT PUMP INSTALLED HOWEVER SHE WAS GETTING A FINAL PRICE SOMETIME THIS WEEK SO THAT ALSO WILL BE SOMETIME BEFORE IT IS INSTALLED. ELECTRICAL REPAIRS STILL NEEDED TO BE COMPLETED AND BART MENTIONED THAT WAS ALSO BEING SUB-CONTRACTED. BART ALSO MENTIONED THAT HE WOULD BE REPLACING AND OR REPAIRING THE REAR EXTERIOR FENCING. I FOUND THAT OWNER IS GOING BEYOND THE REQUIREMENTS THAT I REQUESTED ON MY NOV AND THEREFORE WILL GIVE ANOTHER 30 DAY EXTENSION TO COMPLETE THE RENNOVATION. WILL FOLLOW UP IN MID DECEMBER.NO PICTURES WERE TAKE DUE TO INTERIOR OF STRUCTURE BEING IN SUCH DISARRAY, FLOORING, PAINTING,PATCHING ALL STARTED BUT NOT COMPLETED, ELECTRICAL COVERS OF THE OUTLETS AND SWITCHES NOT ON LEAVING WIRES EXPOSED ETC...
10/03/2005 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, TOOK PICTURES. MET WITH CONSTRUCTION REMODELER MARVIN ON SITE, MARVIN MENTIONED THAT HE WORKED FOR BART STEVENS WHO WAS THE ACTUAL CONTRACTOR FOR THE JOB, AND BART WAS NOT THERE AT THE TIME. MARVIN MENTIONED THAT HE HAD THE DNR LIST OF VIOLATIONS THAT NEEDED REPAIRS, AND MENTIONED THEY WERE IN THE MIDDLE OF MAKING THE REPAIRS. ASKED IF WE COULD WALK THE STRUCTURE TO DETERMINE WHAT THEIR PROGRESS WAS, MARVIN SAID NO PROBLEM AND ALLOWED ENTRY. KITCHEN SKY LIGHT HAD BEEN REPAIRED, DRYWALL REPAIRED AND WAS BEING TAPED AND TEXTURED. ALL BASEBOARD HEATERS HAD BEEN PULLED FROM THE WALLS, MARVIN THOUGHT A NEW HEAT PUMP WAS TO BE INSTALLED. DRYWALL PATCHES THROUGHOUT THE UNIT WERE BEING REPAIRED. LIGHTS WERE BEING CHANGED OUT. CARPET IS TO BE PULLED UP AND COMPLETELY REPLACED. ASKED MARVIN WHEN HE THOUGHT THEY WOULD BE COMPLETED WITH REPAIRS, WAS UNSURE AND DID NOT HAVE CONTACT NUMBER FOR BART STEVENS. TRIED TO MAKE CONTACT WITH OWNERS DON AND VIRGINIA MCCABE, RECEIVED VOICEMAIL, LEFT MESSAGE TO PLEASE CONTACT,LEFT CONTACT NUMBERS.
RECEIVED CALL BACK FROM DON MCCABE WHO MENTIONED THAT IT HAD TAKEN THEM A WHILE TO HIRE A CONTRACTOR, HAD HIRED BART STEVENS, BUT BECAUSE IT IS TAKING HIM LONGER THAN THEY EXPCTED TO DO THE WORK, THAT THE PROJECT IS BEING TURNED OVER TO PARK PLACE DEVELOPMENT. TRIED CONTACTING PARK PLACE DEVELOPMENT, RECEIVED VOICEMAIL, LEFT MESSAGE TO CONTACT WITH CONTACT NUMBERS.