Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T05DV00529
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2006 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, WALKED THE PERMITER OF THE STRUCTURE, FOUND THE SERVICE DITCHTO THE SOUTH SIDE OF THE PROPERTY HAD BEEN FILLED IN. ALL WINDOWS AND CARS REMAINED BOARDED OR PROPERLY SECURED. THE INTERIOR OF STRUCTURE REMAINED THE SAME, NO WORK AD BEEN DONE. PICTURES WERE TAKEN. WILL CONSULT WITH RICK SALDATE. *SPOKE WITH RICK SALDATE WHO MENTIONED THAT IF A PERMIT HAD NOT BEEN SECURED THAT WE WOULD GO AHEAD AND PUT THE CASE INTO CITATION. 7/10/06 * CALLED OWNER SANDRA LEWIS, RECEVIED VOICEMAIL, LEFT A MESSAGE ASKING SHE RETURN MY CALL. * RECEIVE CALL BACK FROM SANDRA LEWIS, WHO MENTIONED THAT THEY DID GO DOWN TO DSD AND WERE ABLE TO HAVE THE PERMIT EXTENDED UNTIL SEPT 2006. SANDRA MENTIONED THAT WORK WAS DONE OVER THE WEEKEND TO CHANGE SOME OF THE EXISTING WORK TO THE MECHANICAL AND MENTIONED THAT AN INSPECTION HAD BEEN CALLED IN TODAY 7/10/06 FOR 7/11/06 MY ISSUES OF THE OPEN SERVICE DITCH AND THE WORK WITHOUT PERMITS ISSUE HAVE BEEN ABATED. DNR WILL NOW COMPLETE THE INSPECTIONS REQUIRED ON THE PERMIT. COMPLIANCE CASE CLOSED!! |
|
| 05/04/2006 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, FOUND PROPERTY TO BE IN THE EXACT SAME CONDITION AS MY LAST VISIT ON 3/23/06. PICTURES WERE TAKEN. A PERMIT IS ON FILE WITH DSD FOR THE CONSTRUCTION OF THE BUILDING. DNR HAS NO JURISDICTION, AS BUILDING IS STILL UNDER CONSTRUCTION, BUT BOARDED FOR SECURITY PURPOSES. WILL CONSULT WITH RICK S BUT ASSUME THAT DSD WILL CONTINUE TO CONDUCT THEIR INSPECTIONS. DNR REALLY HAS NO ISSUES WITH THE STRUCTURE. |
|
| 03/23/2006 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, WALKED EXTERIOR PERIMETER, FOUND THAT STRUCTURE HAD BEEN STARTED & LEFT UNFINISHED OR STILL IN THE PROCESS OF BEING COMPLETED. BLOCK EXTERIOR WAS COMPLETED, ROOF (TRUSSES) INSTALLED, SHEETED & DRIED IN. ALL EXTERIOR WINDOWS HAD BEEN INSTALLED SOME BOARDED. DOOR OPENING WERE NOT COMPLETED BUT ALL OPENING SECURED. IT APPEARS THAT ALL ROUGH PLUMBING, MECHANICAL & ELECTRICAL HAVE ALL BEEN STARTED, BUT NOT COMPLETED. FRAMING INSIDE LOOKS COMPLETE & THERE IS INSULATION LAYING IN PILES INSIDE. ON THE SOUTHSIDE OF STRUCTURE THERE IS AN OPEN DITCH RUNNING FROM THE SIDEWALK TO THE SERVICE PANEL ALSO ON THE SOUTHSIDE OF STRUCTURE. IT'S OBVIOUSLY A SERVICE DITCH, IT LOOKS AS THOUGH IT HAS BEEN PLUMBED FOR WATER, NO ELECTRICAL, NO GAS IN THE DITCH WHICH IS WHY IT'S BEEN LEFT OPEN (I ASSUME). PICTURES WERE TAKEN. |