Case: T05DV00499

Parcel: 107141740


Addresses:

2525 N CASTRO AV

Inspection Status: Correction Required

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
07/08/2005 INSP - INITIAL CODE ENFORCMENT Correction Required KINGS TRAILER PARK:
L) IS PATCHED TO TRAILER ON COMPLAIT OF BREAKER TRIPPING AT THE SERVICE BOX.UPON ARRIVAL THERE WAS AN ELECTRICIAN ON SITE. TROUGH THE CONTRACTOR RESEARCH AND MY CONFIRMATION IT WAS NOTED THAT THE THREE PHASE SERVICE IS BEING OVERLOADED AND THAT THERE IS EVIDENCE OF POST PROBLEMS BECAUSE THE BREAKER THAT ARE NOW INSTALLED ARE REALTIVELY NEW IN COMPARISON TO THE EXISTING 200 AMP SERVICE PANEL BOARD.
AN AMPERE CHECK WAS MADE AT THE TIME(ONLY FOR OHASE A & B) PHASE C WHICH IS THE HIGH LEG OF THE 3 PHASE DELTA SYSTEM IN NO LONGER IN USE FOR REASON OF NOT HAVING THE CORRECT NORMINAL VOLTAGE FOR A MOBILE HOME PARK AND IT WAS ORGINALY DESIGNED FOR USE OF A 3 PHASE WELL PUMP YEARS AGO.
PHASE A WAS PULLING 150 AMPS
PHASE B WAS PULLING 121 AMPS
WITH THE AMP ENCOUNTERED ABOVE AND THR HIGH DEMAND PERIOD YET TO (CAME 4-7 PM THEIR LOAD WILL ONLY INCREASE.
OTHER TIMER OF HIGH USGE BY ELECTRICIAN ON SITE ( NOT WITNESSED BY ME) HAVE BEEN 178 TO 195 AMPS ON PHASE A & B.
IN RESPECT TO THEIR CONDITION A SERVICE UPGRADE IA NOW NECESSARY. ONE OF THE PRIMARY REASONS IS THE RATING OF THE OVER CURRENT DIVISER ARE NOT TO EXCEED 80% EMTINOUS LOAD, THEIR IS ONLY A MAXIMUM OF 160 AMPS THE CONTRACTOR, WHICH MAY BE F&M ELECTRIC WILL BE OBTAINING A SERVICE UPGRADE PERMIT TO INCREASE TO 400 AMPS.
i TOLD THE ELECTRICIAN THAT A DRAWING ( PLANS) MAY BE NECESSARY ALONG WITH LOAD CALLS AND DEMAND FACTORS AS WELL AS OTHER ITEMS SUCH AS NEW GROUNDING.
ULTIMATELY DSD WILL HAVE TO APPROVE.NHARTMAN
07/08/2005 INSP - INITIAL CODE ENFORCMENT Approved MADE AN INTIAL INSPECTION BY REQUEST OF RICK SALDATE TO INFORM HIM OF SITUATION ON M.H. PARK. I SPOKE W/ STONEY (THE MANAGER) & HE TOLD ME THAT IN FACT THE SEWER HAS BEEN TRIPPING & ACTS BROKEN FROM TIME TO TIME IN THE PEAK PERIOD OF THE SUMMER. WE (MANAGER & MYSELF; MANAGER X-ELECT) TOOK AN AMP READING & IN FACT IT WAS OVER THE RATING MINIMUM FOR A CONTINUOUS LOAD EXCEDING 80% OF THE RATING OF THE PANELBOARD. THE PARK MANAGER DID SAY THAT HE HAD ALREADY REQUESTED A NEW SEWER UPGRADE. THE SEWER UPGRADE WILL BE UP TO 400AMP & I STATED THAT PLANS WILL BE REQUESTED EG. A ONE LINE DIAGRAM, LOADS, NEW GRADING, M.H. LAYOUT ETC. WILL NEED A LICENSED CONTRACTOR.