Inspection Status: Approved

Inspection History: PLUMBING - YARD WTR LINE/TEST

Permit Number - T05CM06470

Inspection Description - PLUMBING - YARD WTR LINE/TEST

Inspection Status - Approved

Date Description Inspector Results Comments
03/22/2006 PLUMBING - YARD WTR LINE/TEST Approved IVRS - Inspection :*
OK COMPLETE BACKFILLING, USE CLEAN FILL TO 6" ABOVE TUBING BEFORE COMPLETING BACKFILL WITH MACHINERY AND EXISTING SOIL.
03/21/2006 PLUMBING - YARD WTR LINE/TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
A PRESSURE TEST IS REQUIRED TO CHECK FOR LEAKS BEFORE APPROVAL TO COVER
03/16/2006 PLUMBING - YARD WTR LINE/TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. WATER LINE NOT UNDER TEST
2. INSTALLATION IS IN VIOLATION OF THE UNIFORM PLUMBING CODE AND THE MANUFACTURERS INSTALLATION REQUIREMENTS.
SEE UPC 314.3 "PIPING IN GROUND SHALL BE LAID ON A FIRM BED FOR ITS ENTIRE LENGTH"
UPC SEC 315.4 "PIPING SHALL BE BACKFILLED TO 12" ABOVE TOP OF PIPE WITH CLEAN EARTH, THAT DOES NOT CONTAIN ROCKS OR DEBRIS."
PROVIDE CLEAN FILL AT LOCATION PRIOR TO INSPECTION SO THAT I CAN BE SURE THAT THE ROCKY, CHUNKY FILL THAT IS PRESENT WILL NOT BE USED.
VANGUARD STANDARDS REQUIRE BEDDING AND HAUNCHING OF PIPING.
01/20/2006 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*