Permit: T05CM06429

Parcel: 141091390


Addresses:

6596 E GEHRIG LN

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
12/22/2006 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection :*
11/14/2006 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection :*
1) FRAMED PER APPROVED PLANS
2) OK TO WRAP
3) PLAN APPROVAL MAY REQUIRE CHANGE TO CURRENT FRAMING
11/06/2006 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) PROVIDE CITY OF TUCSON APPROVED DETAIL OF TRIPPLE GIRDER TRUSS BEARING ON HEADER OF 5050 WINDOW, HAVE DETAIL SHOW ALL CONNECTIONS FROM GIRDER TO FOUNDATION
11/01/2006 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
There is no plan or job inspection card on site.| 925*
1) NO REVISED PLAN ON SITE
10/26/2006 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) PAGE 1 OF PLAN SHOWS 3 2 X 4 POST UNDER TRIPPLE GIRDER ON ROOF. PLEASE REVISE PLAN TO SHOW ? REQUIREMENT OF POST ONE THE FIRST FLOOR AND AT FLOOR MID SPAN DEAD SPACE. SPECIFY NUMBER OF KING STUDS AND TRIMMERS UNDER WINDOW HEADER EACH SIDE
2) 4 X 4 POST REQUIRED UNDER STAIR HEADER