Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/21/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/20/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 01/19/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLAN SPECIFICATIONS CALL FOR CAST IRON WASTE & VENT INSTALL PER PLAN OR PROVIDE A STAMPED LETTER FROM ENGINEERING ASSOCIATES INC. ALLOWING THE USE OF ABS. PROVIDE PROTECTION FROM CONCRETE WHERE PIPING PENETRATES FLOOR. |