Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/27/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PROVIDE TEMP CONTROL ON LAVS FOR HOT WATER OTHER THAN WATER HEATER |
|
| 03/11/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLETE LIST FROM 3/5/08 BEFORE CALLING FOR FINAL |
|
| 03/05/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - RECEIVED BACKFLOW CERTS A44833 AND A03485 - SEAL ALL CLEANOUT PLUGS W/APPROVED SEALANT - PROVIDE TRAFFIC RATED CO AT DRIVE THRU - LEAKING PACKING NUT ON RP - PLAN SPECS DISINFECTION OF WATER SYSTEM - PROVIDE BAC T REPORT - INSTALL AND CERTIFY IRRIGATION ASSEMBLY, NEED TO SEE CONNECTIONS - ALL BEV. EQUIPMENT TO BE INSTALLED FOR FINAL - VENT TERMINATION REQUIRED TO BE 3' ABOVE AIR INTAKE OF RTU 906.2 - 906.1 REQUIRES VENT TERMINATION TO BE 1' FROM ANY SIDE WALL - PROVIDE LETTER FOR CHANGE OF FIXTURE SPECS I.E ANGLE STOPS, LAV FAUCET |