Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 08/11/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* SCHEDULE ALL INSPECTIONS BUILDING, PLUMBING, MECH., FIRE ETC. CORRECT THE BELOW LIST & RESCHEDULE ELECTRIC FINAL. 1. MC CABLE NEEDS TO BE PROPERLY SECURED PER CODE THROUGHOUT REMOVE MC FROM STRUCTURAL GRID SUPPORT WIRES 2. POWER POINT NEEDS TO BE PLUGGED IN BELOW CEILING GRID 3. SEAL OPEN KNOCKOUTS 4. SEALL OPEN J-BOXES 5. BOXES OVERFILLED 6. CORDS CAN'T PASS THROUGH 7. INSTALL GFI RECEPTACLES AT ALL SINK LOCATIONS. |
|
| 06/26/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |