Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* ADA UPGRADE OK PLUMBING FINAL OK OK FOR C OF O S.T.O.I |
|
| 01/30/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INTERMEDIATE NOT YET APPROVED 2. REMOVE TOILET FOR CLOSET FLANGE INSPECTION 3. SUPPORT 1/2 CW AND HW AT CHANGE OF DIRECTION 4. ISOLATE 1/2 CW FROM METAL AT WH 5. USE MISSION COUPLING AT TRANSITION FROM CAST IRON TO PLASTIC. 6. FOR FINAL YOU NEED TO INSTALL AN EXPANSION TANK AT WH AND A TEMPERATURE LIMITING DEVICE FOR HW TO LAVITORY. 7. CAULK FIXTURES AND PAINT EXPOSED ABS VENT TERMINATION. |