Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/29/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO PLANS/PERMIT VISIBLE - CANNOT USE SANITARY "T" ON ITS BACK OR SIDE - DESIGNED FOR HORIZONTAL TO VERTICAL FLOW NOT HORIZONTAL TO HORIZONTAL- - FIXTURES IMPROPERLY VENTED - FITTINGS INSTALLED WRONG DIRECTION - MUST INSTALL ALL TO CODE/PLAN TEST 10' HEIGHT RECALL - MUST INSTALL APPROVED 2-WAY CLEANOUTS OUTSIDE OF WALL LINE (DOUBLE STACK) STOPPED INSPECTION |