Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T05CM06129
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/29/2006 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
06/27/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLANS AND CHAPTER 23 OF IBC REQUIRE FROM CONNECTIONS TO BE 16D NAILS-10D NAILS USED 2) EITHER RE-NAIL ALL OF FRAME OR PROVIDE ENGINEERS APPROVED REPAIR |
|
06/26/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : There is no plan or job inspection card on site.| 925* 1) NO PLANS/PERMIT TRUSS DRAWINGS OR PRIOR INSPECTION REPORTS ON SITE 2) PROVIDE PROOF THAT PROPER NAILS WERE USED TO FRAME THIS HOUSE 3) NO LADDER ACCESS TO ROOF |
|
06/21/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STRAP ALL LOCATION ON DBL TOP PLATE NOT CABIN TIED 2) ROOF MISSING NAILING SEVERAL LOCATIONS |