Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/20/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CSA GAS APPROVAL VALVE AT HOUSE NO GAUGE TO METER 2) PROVIDE GAUGE WITH 1/10 PSI INCREMENTATION 3) PROVIDE APPROVED SUPPORT ON ALL GAS PIPING INSIDE AND OUTSIDE HOUSE 4) PROVIDE APPROVED FITTING AND COUPLINGS IN ALL GAS PIPING AND VALVES 5) PROVIDE COMBUSTION AIR IN FURNACE ROOM 6) PROVIDE PROTECTION FOR WATER HEATER 7) PROVIDE SEDIMENT TRAP AT WATER HEATER AND FURNACE 8) PROVIDE FLUE VENT CAP ON ROOF FOR FURNACE |
|
| 10/06/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/31/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |