Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 10/04/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EMERGENCY LIGHTING STILL NOT PER PLAN. HAVE MISSING LIGHTS, NOT WORKING LIGHTS, ALSO EMERGENCY LIGHTING TO BE POWERED BY CKT FEEDING REGULAR LIGHTING FOR THAT AREA PER NEC 700.12 2) STILL NEED TO PROPERLY GROUND LIGHT POLES 3) GO THRU PREVIOUS CORRECTIONS TO MAKE SURE ALL HAVE BEEN COMPLETED BEFORE YOU CALL BACK IN OR A FEE MAY BE CHARGED |
|
| 10/02/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PARTIAL INSPECTION ONLY - WORK NOT COMPLETE 1. USE DOUBLE BARREL LUG TO GROUND LIGHT POLES 2. FINISH SITE/GATE/HAND HOLE ON ROOF 3. SECURE SANYO CONDENSOR TO ROOF 4. 2ND LEVEL WIRING NOT COMPLETE 5. CHECK OCCUPANCY SENSORS FOR PROPER OPERATION 6. EMERGENCY LIGHTING TO BE PER PLAN AND NEC 700.12 7. FINISH ALL LOW VOLTAGE WIRING 8. BOXES TO BE FLUSH TO FACE ON COMBUSTIBLE SURFACE 9. NEED #10 EQUIPMENT GROUND THROUGHOUT EXTERIOR LIGHTING CKT 10. PANEL DIRECTORIES TO BE CORRECT |