Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECT DRIP AT PRV |
|
| 06/01/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/30/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* TERMINATE WATER HEATER VENT CORRECTLY. 1. CALL IN ALL INSPECTIONS THAT HAVE NOT BEEN APPROVED FOR PLUMBING. 2. EXPOSE TRACER WIRE FOR WATER SUPPLY & SEWER. 3. PROVIDE COUNTER SUNK TAPPED CLEAN OUT PLUG WITH MACHINE SCREWS AND CLEAN OUT COVERS AT CLEAN OUTS. 4. FINISH WATER HEATER INSTALL. 5. TERMINATE SEWER CLEAN OUTS. 6. PROVIDE BACKFLOW CERTIFICATION. 7. STOOL TO HAVE MINIMUM 15" SIDE WALL CLEARANCE FROM OBSTRUCTION. |