Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/17/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* BRASS CLEANOUT INSIDE WALK PRESENTS A SLIGHT TRIPPING HAZARD, CAN YOU GET IT LEVEL? OTHER HALF OF TWO WAY C/O NEEDS A FEMALE ADAPTER WITH PLUG. CLEANOUT PLUGS SHALL BE WATER & GAS TIGHT. DISHWASHER HOSE SHALL BE SECURED AS HIGH AS POSSIBLE UNDER KIT. SINK, BUT IN NO CASE LESS THAN 2" BELOW FLOOD LEVEL. TEST ON SHOWER DRAIN CONNECTION IS DOWN, IT MAY HAVE A LEAK IF A LINER WAS NOT INSTALLED FOR SHOWER PAN THIS WILL NEED TO BE CORRECTED. CLEANOUT PLUGS USED TO SECURE COVER SHALL BE DESIGNED AND LISTED FOR SUCH USE. DRILLING OR TAPPING PLASTIC IS PROHIBITED. |
|
| 05/12/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL FOR AND HAVE APPROVED ALL INSPECTIONS PRIOR TO FINAL 3005, 3057, 3040 PROPERLY TRIM OUT ALL CLEANOUTS. CLEAN OUT INSIDE WALK SHALL BE A BRASS BODY CLEAN OUT COVER. PROVIDE A TEST ON SHOWER PAN. |