Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* - CORRECT CLEAN OUTS ON SEWER, ALSO FOR FINAL - CLEAN OUT PLUGS USED TO SECURE COVERS SHALL BE APPROVED FOR SUCH USE. - DW HOSES SHALL BE SECURED AS HIGH AS POSSIBLE - SHOWER PAN REQUIRES TEST |
|
| 02/22/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PIPE WRAPS OK FOR CONCRETE FINAL APPROVAL REQUIRES A STAMPED LETTER FROM KDL DESIGN ALLOWING THE USE OF ABS AND PEX PIPING INSTEAD OF PVC AND COPPER AS SPECIFIED ON PLAN. |
|