Inspection History Details
Inspection Status: Approved
Inspection History: STUCCO MESH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2006 | STUCCO MESH | Approved | IVRS - Inspection :* | |
| 04/18/2006 | STUCCO MESH | Partial Approval | IVRS - Inspection :* 1) COMPLETE POP OUTS AT ENTRY 2) CAULK BOXES AT ENTRY 3) STAPLE WIRES AT SWITCH BY GARAGE ENTRY DOOR 4) NEED ADDITIONAL RECEPTACLE MASTER VANITY 5) SECURE DRYER DUCT AND FHA STRAP 6) FRAME WALL AROUND RETURN AIR 7) INSTALL NEW FURNACE FLOOR 8) ADD ADDITIONAL BLOCKING TRANSFER, AIR BOXES AND ALL MECHANICAL BOXES 9) NAIL ALL BLOCKS AT GARAGE SHEAR PER 10 ON DT-1 |