Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 12/09/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* BUILDING DRAIN OK - CALL FOR PIPE WRAP INSPECTION WATER PIPING MUST MEET PLAN SPECS AND MUST BE CONSISTENT THROUGHOUT SEWER PIPING - PROVIDE 2% SLOPE CLEAN OUTS SHALL ALLOW CLEANING IN THE DIRECTION OF FLOW - 2 WAY C/O ARE OK |
|
| 12/07/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SITE PLAN MUST SHOW BUILDING SEWER TERMINATIONS. 1. 2 SEPARATE ADDRESSES THAT SHAPE A SINGLE HCS CONNECTION WILL REQUIRE A JOINT SEWER AGREEMENT. 2. TEST FITTINGS MUST BE INSTALLED IN THE DIRECTION OF FLOW. 3. 2% SLOPE REQUIRED ON WASTE PIPING 4. SEWER & WASTE PIPING MUST BE SHADED, LEAVE FITTINGS EXPOSED TO CHECK FOR LEAKS. 5. 10' HEAD NOT HOLDING, CHECK FOR LEAKS 6. WATER PIPING MATERIAL DOES NOT MEET PLAN SPECS. |