Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2007 | ENGINEERING - FINAL | Approved | ||
| 04/04/2007 | ENGINEERING - FINAL | Partial Approval | THE SITE WAS CHECKED AND THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME: 1) THE ROOF DRAINAGE IS BEING DEPOSITED DIRECTLY ONTO THE PEDESTRIAN ACCESS AREAS. RE-DIRECT THE RAIN WATER INTO AN AREA WHERE IT WILL NOT AFFECT THE PEDESTRIAN ACCESS POINTS INTO THE STRUCTURES. 2) GENERAL SITE CLEANUP TO REMOVE ALL CONSTRUCTION TRASH AND DEBRIS. 3) REMOVE ALL DUMPSTERS AND PORTA JOHNS FROM THE SITE PRIOR TO REQUESTING THE FINAL INSPECTION FOR ENGINEERING. |