Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/03/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* HORIZ X HORIZ CHANGES OF DIRECTION STILL HAVE 1/4 BENDS ON 6" PIPING ON SOUTH RWLS CHANGES MADE TO RWL FOR T-1 SHALL BE ADDRESSED ON PLAN ABS FITTING NOT ALLOWED ON ALL PVC SYSTEM |
|
| 06/28/2007 | PLUMBING - FINAL | Cancelled | CANCELLED @ 12 PM BY FRED | |
| 06/08/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* YOU ALREADY HAVE HANGER FAILURE. USE LOCKNUTS TO PREVENT THIS. HANGERS SHALL NOT EXCEED 4' SEE NOTES FROM 4/13 AND COMPLY YOU ALSO HAVE CLEANOUT PLUGS W/OPEN HOLES |
|
| 04/13/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PRESENT ARE ED MARLEY W/SWAIM, BRIAN BENEDON AND BOB RICH W/COT 1. IT WAS AGREED THAT A PLAN REVISION WOULD BE MADE AND REVIEWED. 2. DRAINAGE FITTINGS REQUIRED AT VERTICAL TO HORIZONTAL AND HORIZONTAL TO HORIZONTAL CHANGES OF DIRECTION. 3. PROVIDE WATER TEST OF PIPING 4. STRAINERS REQUIRED ON OVERFLOW DRAINS 5. PIPING PASSING THROUGH MASONRY WALLS REQUIRE MASTIC AND CANNOT BE EMBEDDED IN CONCRETE. |
|
| 10/05/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CLOSET FLANGES OK |
|
| 10/03/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE PAST INSPECTION NOTES. SHALL SEE FINAL INSTALL OF UPSTAIRS LAVS IN UNIT 210 TO FINAL |
|
| 10/02/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SHALL COMPLETE FIXTURE INSTALL. TERMINATE WATER HEATER T&P CORRECTLY, CAULK ALL FIXTURES, COMPLETE SECURE OF EXPANSION TANK. ALL ITEMS FROM 9/29/06 |
|
| 09/29/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |