| 07/11/2007 | PLUMBING - INTERMEDIATE | Approved | ||
| 10/03/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 10/02/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. SHALL RESOLVE RAIN DRAINAGE ISSUE 2. SHALL EXPOSE CLOSET FLANGE FOR INSPECTION. |
|
| 09/29/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* - PROVIDE REVISED PLAN OF SEWER CHANGES REQUESTED ON 4/6 - PROVIDE VERIFICATION OF GRADE REQUESTED ON 4/6 - PROVIDE REVISED PLAN OF RAIN LEADERS. EXPANSION ISSUE NOT RESOLVED - RE OVERFLOWS MISSING STRAINERS. NOTE: ROOF DRAINS HAVE NOT BEEN TERMINATED BUT ARE PERMANENTLY CAPPED FOR TEST. THIS IS A POTENTIALLY HAZARDOUS SITUATION. - SOME FIXTURES HAVE NOT BEEN INSTALLED AND THE DRAIN PIPES ARE OPEN. - A SECTION OF SEWER VENTING HAS BEEN CUT OUT AT WH LOCATION. SEWER GASSES ARE VENTING INTO BUILDING. - CLEANOUTS HAVE NOT BEEN TRIMMED OUT. THREAD PLASTIC CLEANOUTS IN WALL SHALL BE ACCESSIBLE. PLUMBER REQUESTED THAT I ALLOW ACCESS PANELS FOR THIS PURPOSE. I AGREED, SO INSTALL 8" ACCESS PANELS AT ALL 4" CLEANOUTS THAT ARE NOT FLUSH W/FINISHED WALL. - CLOSED FLANGES HAVE NOT BEEN SECURED TO FLOOR AS REQUIRED IN 15 5 UPC. - EXTERIOR 4" CLEANOUT HAS 20' OF EXPOSED SUN DAMAGED PVC. - WH T&P NOT TERMINATED, EXP. TANK NOT SUPPORTED. TRAP PRIMER LINES NOT OPEN, NOT SUPPORTED. ALSO, NEED UNIONS AT BOTH TRAP PRIMERS - FIXTURES NOT PROPERLY CHAULKED. THIS LIST IS NOT COMPLETE. |
|
| 09/21/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* - IN RESPONSE TO THE LETTER FROM SWAIN ARCHITECTS, RECEIVED ON 9/20/06 FROM LLOYD CONST. - 2003 UPC INSTALLATION STANDARDS, SEC 313.2 MAKES NO EXCEPTION FOR PIPING INSTALLED WITHIN AN INTERIOR LOCATION. - RAIN WATER INTRODUCED TO RAIN LEADER PIPING COULD REASONABLY BE EXPECTED TO EXHIBIT TEMPERATURES THAT ARE 50 DEG. LESS THAN THE PIPING INSTALLED IN CEILING SPACE. ACCORDING TO TABLE 3-1 - A 50 DEG. DIFFERENCE IN TEMPERATURES WILL CAUSE EXPANSION OR CONTRACTION UP TO 1.74 INCHES ON A 100' PVC PIPE. THIS EXPANSION OR CONTRACTION COULD RESULT IN A FAILURE AT THE DRAIN CONNECTION. PROVIDE AN APPROVED, REVISED PLAN THAT OFFERS A METHOD OF CONTROLLING OR ELIMINATING EXPANSION OR CONTRACTION OF RAIN LEADER PIPING. |
|
| 09/20/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* - CHANGES OF DIRECTION IN 6" HORIZONTAL RAIN LEADERS SHALL COMPLY WITH SEC. 706 - USE APPROVED FITTINGS OF ANGLES REPRESENTED BY 1/8" BEND OR EQUIVALENT SWEEP. |
|
| 08/17/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SUPPORT TRAP PRIMER LINES, OK TO COVER AFTER SUPPORTING FLOOR DRAINS OK DON'T FORGET BACKING AT MS SEC 313.1 VOIDS AROUND PIPES PASSING THROUGH CONCRETE FLOORS SHALL BE APPROPRIATELY SEALED. |
|
| 08/16/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - CORRECTIONS IN TOILET RMS AND DF ARE OK TO COVER - STILL NEED TO SEE FDS AND CLOSET FLANGES AND RAIN LEADERS. |
|
| 08/15/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 2003 UPC INSTALLATION STANDARDS SEC 313.2 AND UPC CHPT 11 SEC. 1101.4 REQUIRES EXPANSION JOINTS. YOU HAVE 5 - 4" CLOS ON FIRST FLOOR AND 3 ON 2ND FLOOR RED LINE 150, PROVIDE SUFFICIENT ACCESS FOR CLOS OK TO COVER BATHROOM DEMISING WALL. MAKE CORRECTIONS AT DF AND LAVITORY ON WEST AND NORTH WALL. EAST LAVITORY WALL AND BREAK RM. OK TO COVER. SEAL JOINTS IN PIPE INSULATION. 2ND FLOOR FDS NOT YET INSTALLED, CLOSET FLANGES 2 FLOOR NOT INSTALLED. CLOSET FLANGES ON ALL FLOORS ARE REQUIRED TO BE SCREWED TO FLOOR |
|
| 08/10/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE METHOD OF CONTROLLING EXPANSION AND CONTRACTION OF 100' RWL + ORWL ON NORTH WALL. PROVIDE WATER TEST. RED LINE ANY CHANGES FOR INSPECTION PROVIDE SWEEPS ON 6" RAIN DRAINS. NOT 1/4 BENDS PROVIDE SUPPORTS AT MAX 4' ON ALL PLASTIC PIPING PROVIDE MID STORY SUPPORTS ON VERTICAL PIPING 100 PSI TEST ON WATER PIPING OK EXCEPT THAT PIPING FOR DGS ARE NOT UNDER TEST. TEST ALL PIPING. REMOVE EXCESS FLUX FROM SOLDIER JOINTS. ISOLATE ALL CW FROM TOUCHING METAL. SECURE 2" HEADER. PROVIDE SEPARATION BETWEEN HOT AND COLD PIPING. PROVIDE ROOM FOR INSULATION PLASTIC THREADS CANNOT BE LOCATED IN A NON-ACCESSIBLE LOCATION. TEST EES SHALL BE SOLVENT WELDED AND PERMANENTLY CAPPED CLEANOUTS SHALL BE ACCESSIBLE. IF EXTENSIONS ARE NEEDED CLEANOUT TEES SHALL BE WYE PATTERN FITTINGS LAVITORY TRAP ARM 1 1/2' MAX, 42" MAX LENGTH 90 DEGREE OFFSET ON TRAP ARMS MAX. |