Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) CONTRACTOR TO RED LINE CHANGES 2) OK TO COVER |
|
| 01/23/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/20/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*NOT INSTALLED PER PLAN NO REDLINES ON SITE. A FURNCO COUPLING IS NOT APPROVED IN OR UNDER ANY BLDG |
|
| 01/18/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*PLEASE POST YOUR SUITE NUMBER NO SEWER P.O.C TO EXISTING BLDG DRAIN EXPOSE ALL OF THE CONNECTIONS TO THE EXISITING |