Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/15/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* ALL CLEANOUT PLUGS HAVE NOT BEEN CORRECTED SHOWER HEADS LEAK AT HOSE CONNECTION CALL FOR INSPECTION OF ANY UNAPPROVED INSPECTION. |
|
| 03/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) USE A LISTED CLEANOUT PLUG DESIGNATED TO RECEIVE A SCREW IN ORDER TO HOLD COVER. SEE PREVIOUS NOTES 2) DRIP ON PACKING NUT AT WH SOV. TURN HANDLE AROUND TO ALLOW FULL OPENING OF VALVE 3) REMOVE INSULATION AT FLUE PIPING 4) PAINT VENT TERMINATIONS WITH LATEX PAINT FOR UV PROTECTION |
|
| 02/23/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* SUPPORT OVERHEAD ABS AT 4' SUPPORT OVERHEAD COPPER AT 6' PROVIDE PROPER CLEANOUT PLUGS & SCREWS TERMINATE T&P PROVIDE ADAPTER AT GRADE FOR EXTERIOR CLEANOUTS NO PROBLEM FOR TEMP C OF O W/MR. LONGS APPROVAL |